PCS 7 process control systems

Catalog
Sort By: all in stock




product

SIEMENS Lifecycle Information Services

9LA1110-8AG10-1AB0

Lifecycle Information Services Basic, on the basis of the provided customer data, an analysis of the equipment is performed. The result of the analysis is a report comprising: . current delivery capability . availability forecast Technical evaluation of the results System size small, up to 50 different products Cyclic report, 1 time per year (the contract is extended automatically by one year, if not terminated 3 months before expiration)

under the order
product

SIEMENS Lifecycle Information Services

9LA1110-8AG10-1AA0

Lifecycle Information Services Basic, on the basis of the provided customer data, an analysis of the equipment is performed. The result of the analysis is a report comprising: . current delivery capability . availability forecast Technical evaluation of the results System size small, up to 50 different products One-time report

under the order
product

SIEMENS Asset Optimization Services

9LA1110-8AE10-8BA0

Asset Optimization Services Time Extension Additional 1 day for analysis and concept This option can be ordered additionally on a one-day basis, e.g. for: comprehensive concepts (> 3 days) and on-site presentation of the analysis results.

under the order
product

SIEMENS Asset Optimization Services

9LA1110-8AE10-8AA0

Asset Optimization Services Product Extension Additional 500 MLFBs for the analysis The analysis of extensive stocks with more than 100 different MLFBs can be ordered with this option in packages of 500 MLFBs .

under the order
product

SIEMENS Asset Optimization Services

9LA1110-8AE10-4BA0

Asset Optimization Services Operation spare parts management Management of a defined spare parts package based on an individual customer offer. The spare parts are property of the customer. The scope of services is the provision of components with defined delivery time and place of delivery for an agreed period. Implementation of cyclic and standardized inventory analyses to consider the product lifecycle.

under the order
product

SIEMENS Asset Optimization Services

9LA1110-8AE10-4AA0

Asset Optimization Services Operation spare parts supply Provision of a defined spare parts package based on an individual customer offer. The spare parts are the property of Siemens. The scope of services is the provision of components with defined delivery time and place of delivery for an agreed period. Implementation of cyclic and standardized inventory analyses to consider the product lifecycle.

under the order
product

SIEMENS Asset Optimization Services

9LA1110-8AE10-3AA0

Asset Optimization Services Implementation (for operation) On the basis of the results from the concept phase 9LA1110-8AE10-2AA0 and an individual offer optimization measures are implemented within a defined period. Objective: Creation of the basis for the Asset Optimization Services Operation

under the order
product

SIEMENS Asset Optimization Services

9LA1110-8AE10-2AA0

Asset Optimization Services Concept (max. 3 days) On the basis of the results of the analysis phase, in cooperation with the customer, a concrete optimization concept is created. A risk evaluation of the components can be carried out together with the customer. With this concept optimized target stock levels can be determined. Identification of excess inventory and missing spare parts. Recommendations for the further procedure are given.

under the order
product

SIEMENS Asset Optimization Services

9LA1110-8AE10-1AA0

Asset Optimization Services Analysis (max. 100 MLFB) on the basis of the provided customer data an analysis and a comparison of the system and stock inventory is performed. The availabilities as well as the product life cycle with discontinuations and delivery periods of the respective products are taken into consideration. The result of the analysis is a standardized, product-oriented report, which is of great importance for the optimization and maintenance of the warehouse stock.

under the order
product

SIEMENS System DCS LCS

9LA1110-8AC10-4AA3

System DCS LCS basically encompasses the same verification contents as the Audit DCS status module in addition, a conformance check regarding the subject terms of the LCS contents is carried out. Result: Lifecycle Conformance Report Objectives: + Possibly complete identification of potential risks + Preparation of a long-term PCS 7 Lifecycle Service agreement with a duration of up to 15 years.

under the order




Partners

Call back